Welcome to our Project Gallery of Churches. Enjoy browsing through our photos of our Past and Recent Projects.

__________________________________________________________________________________________

Rose Hill FWB Church

Design Build

Located on County Home Road in Greenville, NC

Farrior and Sons, Inc. built two classroom wings additions for Rose Hill Church in 2000.  Now we are in the process of building a 10,950 sf Family Life Facility.  Construction began in May of 2011 and will be complete by the first of October.  The facility will have several classrooms, bathrooms, a kitchen, a large gathering area for basketball games, special events, and performances.  There is also a stage with a ramp for access and dressing rooms.  The building is a Varco Pruden pre-engineered building with metal stud framing, painted drywall, exposed ceilings in some areas and acoustical in others.

__________________________________________________________________________________________

Truth Tabernacle Ministries

Located at 704 Arlington St – Rocky Mount, NC

Design/Build project. Completed August 2009

Project Description: 17,804 SF Worship Center. Structural Steel and Concrete masonry construction, with concrete slab over footings. Brick and EIFS exterior facade. Rubber membrane and Shingle roofing systems. Electric Heat Pump heating systems.

__________________________________________________________________________________________

La Grange First Free Will Baptist Church

Located 802 South Caswell Street – La Grange, NC

Design/Build Project. Completed in June 2010.

Project Description: 8,055 SF Fellowship Hall with covered drop-off. Concrete floor slab on grad with ribbon footings, wood framed structure including truss roof system. Brick veneer and membrane and shingle roof. Electric heat pump heating system.

__________________________________________________________________________________________

Belhaven Missionary Baptist Church

Located at 251 Edwards Street-Belhaven, NC

Architectural designed project with Dunn and Dalton, Completed in 2004

Project Description:  9,889SF church addition.  It is a two story building with an elevator.  The addition included a sanctuary, classrooms,  administrative offices, and welcome center.  It is a slab on grade, wood framed, wood trusses, shingle roof, and Hardie plank siding.

__________________________________________________________________________________________

Piney Grove Baptist Church

Located at 2925 Piney Grove Church Road-Williamston, NC

Completed in 2002

Project Description:    When the original church burned, Piney Grove church contracted with Farrior & Sons, Inc. to rebuild their church.  It is a two story facility including Sanctuary, classrooms,  administrative offices, fellowship hall, and kitchen.   It is a slab on grade, wood framed, wood trusses, shingle roof, and brick veneer.

__________________________________________________________________________________________

Temple Baptist Church

Located at 1509 Park Avenue, New Bern NC

Design/Build project with Dunn and Dalton

Phase one was completed in June 2006 – 74,727 sf

Phase two was completed in November 2007 – 24,176 sf

Project Description: 98,903 sf new church. 

The facility is slab on grade, two story construction, consisting of structural steel, masonry and metal studs.  It has brick veneer, EFIS, metal and membrane roof systems.  The building has a two story educational wing, large gathering space, and administrative offices.  It also houses a multipurpose area with regulation size gym, full service kitchen, and youth center.

__________________________________________________________________________________________

Covenant United Methodist Church

Located at 4000 Corey Road, Greenville NC

Design/Build project

Completed in March 2009

Project Description: 44,872 sf new church

This building has a slab on grade, structural steel, metal stud with a membrane roof.  There is a two story educational wing, a large central gathering space called Main Street, and a large stage area with theatrical lighting and sound, video production area and an elevator.