Dr. Richard Carlyle

 Loccated at 206 Airport Road-Kinston, NC

Architect Designed Project.  Project began October 2001

Project Description:  Dental Office with a hair salon located at the rear of the building.  It is a slab on grade, wood framed building with wood trusses, standing seam metal roof, stone veneer, upscale millwork, and finishes throughout. 

 

__________________________________________________________________________________________
Dr Johnathan Earp

Located at 2446 Emerald Place – Greenville, NC

Design/Build project. Completed August 2009

Project Description: 6,482 SF Dental Office.

The building has a slab on grade foundation, wood frame construction, a rubber membrane roof system, brick and EIFS veneer. There is a large entry tower on the front of the.  There are four hygiene rooms and four exam rooms.  There is a consultation room, staff lounge and private offices.

__________________________________________________________________________________________

Dr. Lesan Family Dentistry

Located at 123 Cobia Court – Jacksonville, NC

Public Bid project. Completed January 2009

Project Description: 4,098 SF 1st floor finished and 1,719 SF 2nd floor unfinished
wood frame construction, concrete slab on grade. Brick, block and stucco veneer, shingle roof, heat pump mechanical system.  There are seven treatment rooms, adult and kids waiting room, a lab, sterilization room, and administrative offices.

__________________________________________________________________________________________

Dr.  Angie Rhodes Dentistry

Located at 200 Patrick Lane, Chocowinity, NC

Design/ Build Project

Completed in November 2007

Project Description:   5,263 sf Dental Office

The project is slab on grade, wood framed with pre-engineered wood trusses.  It has a shingle roof with vinyl shake siding and stone accents.  The facility has four operatory rooms, two hygiene rooms, a lab and sterilization room.  There is a staff lounge, administrative and finance area, as well as a second floor space.  The waiting area has a stone accent wall and reception counter.

__________________________________________________________________________________________

Dr. Brook Bundy

Located at Lot 13 McLamb Place, Waynesboro Office Subdivision, Goldsboro, NC

Design/ Build Project

Completed in March 2003

Project Description:  3,890 sf Dental Office

This building is a slab on grade wood framed construction with brick veneer and shingle roof.  There is a covered drop off area for patients.  It has six operatory rooms, a patient education room, administrative and office areas, staff break room, waiting room and reception.

__________________________________________________________________________________________

Dr. Karen Shaw

Located at 1100 Professional Park, Greenville, NC

Design/ Build Project

Completed in November 2003

Project Description:  5,790 sf Dental Office

The building is slab on grade, wood framed with pre-engineered roof trusses, shingle roof, split face block and brick veneer, with EFIS accents.  The original building was completed in November of 2003.  In June of 2010 Farrior and Sons upfit the second portion of Dr. Shaw’s building which included 7 new operatories, an office, and waiting room.  The second floor upfit included a staff lounge, kitchen and a multipurpose room.

__________________________________________________________________________________________

Dr. Anthony Muray

Located at 1026 W.H. Smith Blvd, Greenville NC

Design/ Build Project

Completed in March of 2010

Project Description: 7,102 sf Dental Office

This building is a slab on grade, wood framed with pre-engineered roof trusses, shingle roof, brick veneer and hardy plank siding.  It has a covered drop off for patients.  There are four surgical rooms, sterilization room, consultative rooms, administrative offices and a staff lounge.